Home Page

About Us

Our Products

What's New?

Links

Contacts

Suites 2 & 3, Greenbank House, Swan Lane,
Hindley Green, Wigan, WN2 4AR, United Kingdom
Tel: +44(0)1942 522180 / 522153, Fax: +44(0)1942 522179
pim@dcvg.com
or sales@dcvg.com

© Pipeline Integrity Management Ltd. 2008

We Lead - Others Follow

Cathodic Protection

Design and Specification
- New CP Designs using Impressed Current or Sacrificial Anode Systems
- Redesign of CP Systems During Refurbishment Activities
- Design of Temporary Systems During Construction
- Independent Appraisal of CP Designs and Specifications
- Materials and Equipment Specifications for Purchasing and Installation

Project Management
- Project Planning, Scheduling and Administration
- Construction Supervision, Inspection and Troubleshooting
- Quality Control Procedures and Practices for Procurement and Construction

Potential Surveys
- Pipe to Soil Potential Measuring Techniques
- Routine ON and OFF Potential Monitoring Surveys
- Computerised Techniques for Data Capture and Interpretation
- Routine Monitoring and Reporting

Operation and Control
- Routine Maintenance, Repair and Adjustment of CP Systems
- Commissioning and Testing of New CP Systems
- Preparation of Monitoring and Maintenance Manuals
- Right of Way Inspection
- Quality Control of Routine Measurements
- Negotiations with other CP Operators

Troubleshooting
- Low Pipe to Soil Potentials
- Ground Bed Problems
- Interference
- Coating Degradation
- Third Party Problems
- Operator Training
- Bad CP Design or Installation
- Poor Data Interpretation
- Stress Corrosion Cracking Studies

Auditing
- Auditing of Complete Company CP Monitoring and Maintenance Activities
- Detailed Auditing of Complete CP Systems to Identify Inadequacies and Lack of Maintenance and Repair
- Auditing of Interpretation of Potential Measurements to Accepted Criteria

Back

More

Deep well anode bed.

5 Amp solar system

Software
-
Software for Monitoring and Maintenance of all types of CP Systems.
- CP Auditing Software.

Broken SiFe Anode