“New corrosion detection method for buried pipelines, Part 1&2”, Pipe Line Industry, December/January 1992/93
“Coating inspection of buried pipe work in tank farms, process plants and other complex pipeline systems”, The Fourth European and Middle Eastern Pipeline Rehabilitation Seminar, April 1993
“A practical comparison of above ground techniques for coating defect delineation”, Industrial Corrosion, March 1988
“A critical review of the techniques used to delineate pipeline coating defects as a precursor to refurbishment”, Second European and Middle Eastern Pipeline Rehabilitation Seminar, April 1991
“Urban gas leak pinpointed with combined surface techniques”, Pipeline & Gas Industry, November 1995
“Tree roots can accelerate coating degradation and the need to rehabilitate”, Pipe Line Industry and Pipes & Pipeline International, Seminar September 1993
“CP equipment should be surveyed along with pipeline coating”, Pipeline Industry, December 1994
“Coating rehabilitation for high-temperature gas lines”, Pipe Line Industry, March 1992
“Selecting tape coating systems for in situ repair of pipelines!, Corrosion & Coatings SA, August 1992
”Parameters that determine the need for external pipeline refurbishment“, Pipe Line Industry and Pipes & Pipelines International, Seminar May 1991
”The application of DC voltage-gradient technology to accurately determine buried-pipeline rehabilitation requirements“, Pipe Line Industry and Pipes & Pipelines International, Seminar September 1994
”A detailed cost-benefit analysis of a large pipeline coating and cathodic-protection rehabilitation project-Part 1&2“, Pipe Line & Gas Industry and Pipes & Pipelines International, Seminar November 1996
”Epicentre pipe-to-soil potentials measured without trailing cables“, Pipeline & Gas Industry, June 2001
|